![]() |
|||
Field Trips |
|||
Donner Summit - June 23, 2007
West Portal Tunnel #7
East Portal Tunnel #6
"China Wall" between Tunnels 7 & 8
Portions of Old Wagon / Highway Grade
"China Wall and Tunnel #8
Subway, "China Wall" and Tunnel #8
1926 Donner Summit Bridge and Highway
Tunnel #7 from Tunnel #8
Top of Vertical Shaft Down to Tunnel #6
West Bound on abandoned double track grade.
Norden Snowsheds & Abandoned Track.
East Bound UP freight exiting snowshed.
|
|||
Home About Us Contact Us Newsletter Calendar Copyright 2008 Placer Sierra Railroad Heritage Society |
|||