Field Trips
     
 

Donner Summit - June 23, 2007

West Portal Tunnel #7

East Portal Tunnel #6

"China Wall" between Tunnels 7 & 8

Portions of Old Wagon / Highway Grade

"China Wall and Tunnel #8

Subway, "China Wall" and Tunnel #8

1926 Donner Summit Bridge and Highway

Tunnel #7 from Tunnel #8

Top of Vertical Shaft Down to Tunnel #6

West Bound on abandoned double track grade.

Norden Snowsheds & Abandoned Track.

East Bound UP freight exiting snowshed.

 









   

Home  About Us  Contact Us  Newsletter  Calendar
Projects  Field trips  Links

Copyright 2008 Placer Sierra Railroad Heritage Society